Hall Winery-Geowall Max

Hall Winery Engineered Retaining Wall

To accommodate their expansion, Hall Winery evaluated options to reduce the size of an existing retention pond on their St. Helena property. Initial estimates utilizing a cast-in-place retaining wall were more than $300,000 and would have required more than 14 days to allow the concrete to cure and to strip the forms.

A value engineering proposal was submitted using Basalite Geowall Max Retaining Wall System.  The GeoWall Max wall was installed in one week and saved the winery more than $150,000 in costs.

 

Engineer: AEI Engineering

Contractor: KS Construction